Sign In | Join Free | My udpf.com
China Shenyang iBeehive Technology Co., LTD. logo
Shenyang iBeehive Technology Co., LTD.
Shenyang iBeehive Technology Co., LTD. Steel Structure Professional Manufacturer with 23 years of experience!
Verified Supplier

9 Years

Home > Warehouse Steel Structure >

Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized

Shenyang iBeehive Technology Co., LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized

Brand Name : ibeehive

Place of Origin : shenyang

MOQ : 500 Tons

Price : US $800 - 1000

Supply Ability : 5000 tons per month

Delivery Time : Shipped in 30 days after payment

Packaging Details : By clients requirement in 40'OT/ 40'HQ/ 40'GP/ 20'GP Containers.

Product name : warehouse steel structure fabricated

Standard : ASTM,BS,DIN,GB,JIS

Grade : Q235, Q345

Dimensions : 00 SQM to 100000 SQM

Size : up to customer's require

wind resistance : grade 12

Contact Now

Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized

Product Description:
Steel structure warehouse is the third generation construction. It adopts H type steel structure , C type steel steel structure and Z type steel structure to combine or build framework. Roof and wall are color steel sandwich panel. Steel structure has basically substituted traditional reinforced concrete in developed country. It has many excellent characteristics like light weight, big span, fewer materials, low cost, short building cycle, beautiful appearance, etc. It is widely applied to monolayer workshop, storage, warehouse, business architecture, office block, multistorey parking space, and family house, etc.
Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized

Steel Structure Specification:

1. Main frame : Hot-dip galvanized or painted steel ,“H” steel structure, ”C” and ”Z ” cold-formed thin-walled section steel structure

2. Roof :50mm-100mm EPS, PU, Rockwool sandwich panel/color steel roof sheet/glazed roof tile

3. Wall :50mm-100mm EPS, PU, Rockwool sandwich panel.

4. Door :Sandwich panel door, security door or electric roller shutter door

5. Window : PVC sliding, aluminum alloy or shutter

6. Cost-effective:Low cost, fast erection compare to concrete building(1/5 building cycle )

Prefabricated warehouse steel structure sales:North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized

Steel Structure Building Main Materials:

Material Q345/Q345B or Q235/Q235B Steel, Straight or Variable cross-section

X-type or V-type or other types bracing made from round, angle pipes etc.

C or Z type: Size from C120~C320, Z100~Z200

Single Colorful Corrugated Steel Sheet

Sandwich panels with Rockwood, Fiber glass, EPS/FOAM, PU etc.

High Strengthen Bolt, Flange Bolt, Self tapping screws,HS Bolt, Normal Bolt, Post feet Bolt.

Skylight Belts, Ventilators, Down Pipe, Rolling or Sliding Door, PVC or Aluminum Alloy Windows, Gutter etc.

Two lays of Anti-rust Paint, Galvanized, painting,

Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized

Steel Structure Building Characteristics:

1. Pillars distance is 6 meters normal, Purlins distance is 1.2 meter normally, if want to be more strong can be 0.8 or 1 meter as client requirements,

2. Low cost: Engineer and Designer will design and choose the plan as the economy and will not affect building strong and safety

3. Fast construction and easy in installation, can send engineers to command

4. Span life is at least 50years

5. Other characteristics: environmental protection, stable structure, earthquake resistance, water proofing, and energy saving

Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized

Qoutation:

Supposing that you have design drawings, we will provide a estimated quotation and bill of material acoording to it. If have not design drawings, pls confirm the follwoing information:

1. Size: Length* Width*Height (eave height)

2. Local wind speed(km/h),Snow load(kg/m2)

3. Wall and Roof: Steel Sheet or Sandwich Panels?

4. Door and Windows: Size and Quantity

5. Other needs or not: Gutter, Down Pipe, Skylight Panels, Fan

6. Crane: if have, pls tell me the crane span, crane lift height, max lift capacity

Drawings:

We are waiting for your testing our professional at any time. Our excellent design team will freely design the steel structure warehouse, workshop, steel building, construction building for you. Pls confirm the following information, then we will gice you an satisfactory drawings.

1. Size: Length* Width*Height (eave height)

2. Local wind speed(km/h),Snow load(kg/m2)

3. Wall and Roof: Steel Sheet or Sandwich Panels?

4. Door and Windows: Size and Quantity

5.Other needs or not: Gutter, Down Pipe, Skylight Panels, Fan

6.Crane: if have, pls tell me the crane span, crane lift height, max lift capacity

Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized

Installation:

We will provide detail installation drawings, then your side can easy to install the projects according to it. Also, If you need, we can provide a practised engineer to command .we will supply all technical support during installation and after-sale service.

Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized

Product Tags:

steel warehouse construction

      

steel structure garage

      
Best Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized wholesale

Anti Rust Warehouse Steel Structure Prefab Metal Buildings Hot Dip Galvanized Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shenyang iBeehive Technology Co., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)